Search results
Results: 229
Number of items: 229
-
Goedhart, R., da Silva, M. M., Schoonhoven, M., Epprecht, E. K., Chakraborti, S., Does, R. J. M. M., & Veiga , A. (2017). Shewhart control charts for dispersion adjusted for parameter estimation. IISE Transactions, 49(8), 838-848. https://doi.org/10.1080/24725854.2017.1299956 -
Kuiper, A., van de Hoef, R., Wesseling, M., Lameijer, B. A., & Does, R. J. M. M. (2016). Quality Quandaries: Improving a customer value stream at a financial service provider. Quality Engineering, 28(1), 155-163. https://doi.org/10.1080/08982112.2015.1089445
-
Lameijer, B. A., Does, R. J. M. M., & de Mast, J. (2016). Inter-industry generic Lean Six Sigma project definitions. International Journal of Lean Six Sigma, 7(4), 369-393. https://doi.org/10.1108/IJLSS-11-2015-0044
-
Zwetsloot, I. M., Schoonhoven, M., & Does, R. J. M. M. (2016). Robust Point Location Estimators for the EWMA Control Chart. Quality Technology and Quantitative Management, 13(1), 29-38. https://doi.org/10.1080/16843703.2016.1139845
-
Lameijer, B. A., Veen, D. T. J., Does, R. J. M. M., & de Mast, J. (2016). Perceptions of Lean Six Sigma: a multiple case study in the financial services industry. Quality Management Journal, 23(2), 29-56. https://www.researchgate.net/publication/301655658_Perceptions_of_Lean_Six_Sigma_A_Multiple_Case_Study_in_the_Financial_Services_Industry
-
Nazir, H. Z., Abbas, N., Riaz, M., & Does, R. J. M. M. (2016). A Comparative Study of Memory-Type Control Charts under Normal and Contaminated Normal Environments. Quality and Reliability Engineering International, 32(4), 1347-1356. https://doi.org/10.1002/qre.1835
-
Goedhart, R., Schoonhoven, M., & Does, R. J. M. M. (2016). Correction factors for Shewhart X and X-bar control charts to achieve desired unconditional ARL. International Journal of Production Research, 54(24), 7464-7479. https://doi.org/10.1080/00207543.2016.1193251
-
Does, R. J. M. M., de Mast, J., & Schoonhoven, M. (2015). Discussion of "An emerging science of improvement in health care". Quality Engineering, 27(1), 35-40. https://doi.org/10.1080/08982112.2015.968044
Page 4 of 23