Search results
Results: 229
Number of items: 229
-
Goedhart, R., Schoonhoven, M., & Does, R. J. M. M. (2018). Discussion. Journal of Quality Technology, 50(1), 17-19. https://doi.org/10.1080/00224065.2018.1404886
-
Goedhart, R., Schoonhoven, M., & Does, R. J. M. M. (2018). On guaranteed in-control performance for Shewhart X and X− control charts. Journal of Quality Technology, 50(1), 130-132. https://doi.org/10.1080/00224065.2018.1404876
-
Lameijer, B. A., Zwetsloot, I. M., & Does, R. J. M. M. (2018). Discussion of “Quality and statistical thinking in a parliament and beyond”. Quality Engineering, 30(1), 27-33. https://doi.org/10.1080/08982112.2017.1374787 -
Huberts, L. C. E., Schoonhoven, M., Goedhart, R., Diko, M. D., & Does, R. J. M. M. (2018). The performance of X̄ control charts for large non-normally distributed datasets. Quality and Reliability Engineering International, 34(6), 979-996. https://doi.org/10.1002/qre.2287 -
Goedhart, R., Schoonhoven, M., & Does, R. J. M. M. (2017). Guaranteed In-Control Performance for the Shewhart X and X Control Charts. Journal of Quality Technology, 49(2), 155-171. https://doi.org/10.1080/00224065.2017.11917986
-
Lameijer, B. A., de Mast, J., & Does, R. J. M. M. (2017). Lean Six Sigma deployment and maturity models: A critical review. Quality Management Journal, 24(4), 6-20. https://doi.org/10.1080/10686967.2017.12088376
-
Goedhart, R., Schoonhoven, M., Zwetsloot, I. M., & Does, R. J. M. M. (2017). Discussion of ‘Bridging the Gap between Theory and Practice in Basic Statistical Process Monitoring’. Quality Engineering, 29(1), 18-21. https://doi.org/10.1080/08982112.2016.1210453
-
Diko, M. D., Goedhart, R., Chakraborti, S., Does, R. J. M. M., & Epprecht, E. K. (2017). Phase II control charts for monitoring dispersion when parameters are estimated. Quality Engineering, 29(4), 605-622. https://doi.org/10.1080/08982112.2017.1288915
Page 3 of 23