CUSUM Charts with Controlled Conditional Performance Under Estimated Parameters

Authors
Publication date 2016
Journal Quality Engineering
Volume | Issue number 28 | 4
Pages (from-to) 402-415
Organisations
  • Faculty of Economics and Business (FEB) - Amsterdam Business School Research Institute (ABS-RI)
Abstract
We study the effect of the Phase I estimation error on the cumulative sum (CUSUM) chart. Impractically large amounts of Phase I data are needed to sufficiently reduce the variation in the in-control average run lengths (ARL) between practitioners. To reduce the effect of estimation error on the chart's performance we design the CUSUM chart such that the in-control ARL exceeds a desired value with a specified probability. This is achieved by adjusting the control limits using a bootstrap-based design technique. Such approach does affect the out-of-control performance of the chart; however, we find that this effect is relatively small.
Document type Article
Language English
Published at https://doi.org/10.1080/08982112.2016.1144072
Permalink to this page
Back