Design Considerations and Tradeoffs for Shewhart Control Charts

Authors
Publication date 2021
Host editors
  • S. Knoth
  • W. Schmid
Book title Frontiers in Statistical Quality Control 13
ISBN
  • 9783030678555
ISBN (electronic)
  • 9783030678562
Event 13th International Workshop on Intelligent Statistical Quality Control
Pages (from-to) 13-23
Publisher Cham: Springer
Organisations
  • Faculty of Economics and Business (FEB) - Amsterdam Business School Research Institute (ABS-RI)
  • Faculty of Economics and Business (FEB)
Abstract
When in-control parameters are unknown, they have to be estimated using a reference sample. The control chart performance in Phase II, which is generally measured in terms of the Average Run Length (ARL) or False Alarm Rate (FAR), will vary across practitioners due to the use of different reference samples in Phase I. This variation is especially large for small sample sizes. Although increasing the amount of Phase I data improves the control chart performance, others have shown that the amount required to achieve a desired in-control performance is often infeasibly high. This holds even when the actual distribution of the data is known. When the distribution of the data is unknown, it has to be estimated as well, along with its parameters. This yields even more uncertainty in control chart performance when parametric models are applied. With these issues in mind, choices have to be made in order to control the performance of control charts. We discuss several of these choices and their corresponding implications.
Document type Conference contribution
Language English
Published at https://doi.org/10.1007/978-3-030-67856-2_2
Permalink to this page
Back